Hyundai Steel Coke and Gas Treatment Plant

Hyundai Steel Coke and Gas Treatment Plant

  • Project Name

    Hyundai Steel Coke and Gas Treatment Plant

  • Location

    Dangjin, Korea

  • Client

    Hyundai Steel

  • Project Period

    Jan. 2008

  • Capacity

    Coke : 3.138 Mil Ton/year
    COG : 13.3 Mil Nm3/year

Hyundai Steel Integrated Mill Cokes Oven Construction 토토 사이트 추천
1 / 4
  • Hyundai Steel Integrated Mill Cokes Oven Construction 토토 사이트 추천
  • Hyundai Steel Integrated Mill Cokes Oven Construction 토토 사이트 추천
  • Hyundai Steel Integrated Mill Cokes Oven Construction 토토 사이트 추천
  • Hyundai Steel Integrated Mill Cokes Oven Construction 토토 사이트 추천

Efforts for problem solving

We focused our efforts on improving the design to reduce the scattering of unprocessed coal and minimize pollution from the emissions of harmful substances. As part of this effort, we installed a cokes oven door self-sealing device to prevent the release of coke oven gas, an emission control system for reducing dust scattering, and a desulfurizer device to cut sulfides (SOx) released into the atmosphere.

We also applied a biochemical wastewater treatment technology to improve the quality of the wastewater produced in the oven process.

토토 사이트 추천 Logistics Kwangmyung Distribution Center

토토 사이트 추천 Logistics Kwangmyung Distribution Center

  • Project Name

    토토 사이트 추천 Logistics Kwangmyung Distribution Center

  • Location

    Kwangmyung, Korea

  • Client

    토토 사이트 추천 Confectionary / 토토 사이트 추천 Chilsung Beverage

  • Project Period

    Dec.2007 ~ Mar.2011

  • Capacity

    Total Floor Area: 50,000 m2
    Occupied Area: 73,6899 m2

토토 사이트 추천 Logistics Kwangmyung Distribution Center
1 / 4
  • 토토 사이트 추천 Logistics Kwangmyung Distribution Center
  • 토토 사이트 추천 Logistics Kwangmyung Distribution Center
  • 토토 사이트 추천 Logistics Kwangmyung Distribution Center
  • 토토 사이트 추천 Logistics Kwangmyung Distribution Center

Efforts for problem solving

We focus our efforts on evaluating vibration property data from a floor slab caused by operating a forklift inside of the distribution center. After performing dynamic stiffness test for each floor and analyzing allowable limits of vibration, we have successfully completed to determine factor of safety and design a steady structure for avoiding crack and deformation on a slab by PRECOM method of construction.