Lotte E&C has extensive experience in 토토 메이저 사이트 construction
Based on the experience gained from building Gwangyang Steel Works the world’s largest integrated steel mill in the 1980s, Lotte E&C has since constructed Hyundai Dangjin Steel Mill, Korea’s largest Lotte Mart Osan Distribution Center, and Lotte-Samgang Cheonan 토토 메이저 사이트. As for power generation 토토 메이저 사이트 construction, we converted West Incheon Thermal Power 토토 메이저 사이트 into a 2,000-megawatt-class combined cycle power 토토 메이저 사이트.We are also a leading contractor in the New Naepo City, Daegu, and North Busan Port collective energy projects. Renewable energy projects such as the Garorim Bay Tidal Power Station, wind power, and solar power installations are other areas where Lotte E&C has expanded. Wastewater treatment, solid waste treatment, and renewable energy extraction from waste materials are other areas where Lotte E&C is expanding. In cooperation with the affiliate Honam Petrochemical and KP Chemical, we have participated in building petrochemical 토토 메이저 사이트s in Malaysia and Uzbekistan.With Korea’s mature 토토 메이저 사이트 construction market, we are expanding our range of operations and have completed an LPG storage facility and 400-megawatt gas-fueled thermal power 토토 메이저 사이트 in Jordan. In December 2011, we won another order from Jordan to build the 600-megawatt Al-Manakh diesel-fueled power 토토 메이저 사이트.Construction has been completed on 토토 메이저 사이트s for Lotte Confectionary in India and Russia, and construction is underway for Hankook Tire’s Indonesia and China 토토 메이저 사이트s. Learn more

Power/Green Energy
Power generation and green energy 토토 메이저 사이트s include combined cycle power generation, combined heat thermal power generation, resource recycling facilities, and wastewater treatment centers. This area of Lotte E&C began with the building of a combined cycle power generation 토토 메이저 사이트 for Lotte World Seoul and Lotte World Busan. These were followed by the Southeast CES project and the turnkey project to build the Pangyo combined heat power 토토 메이저 사이트. We are building power 토토 메이저 사이트s and collective energy facilities in Andong, Chungla/Gimpo, Youngheung Thermal Power 토토 메이저 사이트 (Nos. 5&6), and Daegu.As part of our strategy to increase overseas business, we completed Jordan’s Al-Katrana combined cycle power 토토 메이저 사이트 and are now working on the Al-Manakh diesel-fueled 토토 메이저 사이트, the world’s largest.Propelled by Korea’s best technological capabilities, we are entering exciting new markets such as wind and tidal power, and renewable energy 토토 메이저 사이트s.To create a more prosperous future, we are expanding the green environment 토토 메이저 사이트 area, including wastewater and solid waste treatment, and renewable energy extraction from waste materials. Municipal sewage treatment, sewage water recycling, sewage pipe installation, and resource extraction represent new growth areas for Lotte E&C.
View Past Performance
Petrochemical 토토 메이저 사이트s
In chemical 토토 메이저 사이트 construction, Lotte E&C completed the Honam Petrochemical’s NCC, BTX 토토 메이저 사이트, utility & off-site 토토 메이저 사이트, SM, BD, PC, EO/EG, PE/PP, and MMA/PMMA 토토 메이저 사이트s within the Yeocheon Petrochemical Industrial Zone.In overseas markets, we completed the project to build LPG storage tanks in Jordan, followed by a petrochemical 토토 메이저 사이트 construction project in Malaysia.Lotte E&C is committed to winning orders in partnership with group chemical companies in Central and Southeast Asia, and the Middle East.
View Past Performance
Industrial 토토 메이저 사이트s
Lotte E&C built POSCO No. 1 in 1972, followed by Gwangyang Steel Mill (stage 4) in 1993, and the Hwasung Mill of Hyundai Steel in 2010 and 2011. In other areas of 토토 메이저 사이트 construction, we built 토토 메이저 사이트s at the Lotte-Samgang Cheonan location (2005), Boulangerie (2007), Samgang Poseung (2008), and Osan/Gimhae/Gwangmyong distribution centers. In overseas markets, we built the Lotte Confectionary 토토 메이저 사이트s in India and Russia (both in 2010) and are constructing 토토 메이저 사이트s in Indonesia and China for Hankook Tire. This expertise positions Lotte E&C to expand into other industries from its current lineup of steel, food and beverage, and distribution centers.
View Past Performance
interview
The Pioneers of Overseas Power Plant Construction, Al-Katrana (Jordan)
Interview exhibiting confidence in the company/technology/quality: We had a lot of difficulties implementing this first overseas’ project for Lotte E&C. But after considering how this was creating something great out of nothing, we completed the engineering, procurement, and construction of the 400-megawatt combined cycle thermal power 토토 메이저 사이트 from design to purchase, construction, and pilot operation in 2011. Although this is my personal pride, the fact that all of our employees gained enormous confidence from accomplishing it is much more gratifying. Thinking that we could become a force to be reckoned with in the Middle East construction market fills my heart with pride.
Project : Al-Katrana Power Generation 토토 메이저 사이트, Jordan
Period : March 2009 – November 2011
Name/Department : Lee Duksoo, On-site Manager (Executive)/Al-Manakh (Jordan) Power Generation Project
The Pioneer in Overseas Expansion of Plant Building Business “Jordan LPG Storage Facilities Project”
Since I arrived in Jordan, I have faced many disparities in business practices with the commissioning company. But I finally earned their trust after I introduced the latest construction site management practices and technologies. As part of safety measures to achieve a no-accident record, we even installed gas detection systems within the compound after considering the possibility of a gas explosion in the surrounding area’s dilapidated facilities. We asked the commissioning company’s employees as well as workers on site to adhere strictly to our safety rules. We responded quickly to questions arising from complicated technical codes and standards by explaining them one by one while strengthening the on-the-job training of plant engineers on operations and maintenance through presentations and actual performance. In January 2010, there was an abduction incident by Somali pirates involving a ship carrying the ball tank spray ring systems, one of the most critical materials for the project. This unexpected development delayed the project by six months so we made an additional order while persuading the commissioning company to share the responsibility. We finally got approval for the additional order and cost overruns caused by the delays. Thanks to our proven ability to get the job done, we were asked to participate in several other projects that the commissioning company had been promoting. Even though it was a small-scale project, we felt unparalleled pride to have finished our first-ever overseas engineering, procurement, and construction project.
Project : Automatic LPG Storage Facilities Project
Period : September 2008 – November 2010
Name/Department : Chemical 토토 메이저 사이트s/Oh Jun-Hyun, Manager
“Hyundai Steel Dangjin Integrated Steel Mill,” the Model Case for an Integrated Mill
Interview exhibiting confidence in the company/technology/quality: Construction of the Dangjin Steel Mill was literally a continuation of suffering and unforeseen obstacles. The site was located on soft ground and frequent rains made our job to strengthen it much harder. Immediately after we broke ground, the global financial crisis of 2008 hit, which added to our difficulties in getting construction supplies in time. Nonetheless, we persevered and completed the project two months ahead of schedule. It was all thanks to the selfless effort of our team members who had gained valuable experience from building steel mills in Pohang and Gwangyang for POSCO in the 1990s. The completion of this project made us world famous in industrial 토토 메이저 사이트 construction. From three years of field experience, our people became experts in steel mill building and based on the performance in Dangjin, we later won a number of similar projects in Southeast Asia. We hope to become a globally competitive construction company with incomparable capabilities in steel 토토 메이저 사이트 construction.
Project : Hyundai Steel Dangjin Integrated Steel Mill Construction Project
Period : December 2007 – December 2010
Name/Department : Industrial 토토 메이저 사이트s/Lee Jang-Hyun, Project Manager